Remove Electrical Remove Estimating Remove Feasibility Remove Sewer
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

THE ESTIMATING PROCESS FROM A TO Z Here in this cover story we are going to present you the basic details of the estimation. First, we have to download the estimating and budgeting spreadsheet. CUSTOMIZING THE ESTIMATING AND BUDGETING WORKSHEET This is an excel format of spreadsheet. A patience read is necessary here.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Equipment or transmission lines used directly in producing or transmitting electrical power, but not including distribution.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. PUBLIC UTILITY TAX REBATES: Tax Credits are available for a rebate of 50 percent of the public utilities tax imposed on new or increased consumption of gas and electricity for five years. The public utilities tax rate is 4.25

Income 75