Remove Engineering Remove Fabrication Remove Feasibility Remove Negotiation
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

At least 65 percent of these funds will be provided for expansion of the Computer Science Division of the School of Electrical Engineering and Computer Science at LSU. To fast-track program growth, LSU’s College of Engineering will launch the “Geaux Digital Louisiana” consortium. AIRBUS: POWERFUL ENGINE FOR GROWTH IN MOBILE REGION.

Metro 110
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. Contracting personnel and civil engineers are encouraged to adapt their SABER-like acquisitions and processes to meet their local needs and the local environment. 3.4.2.2.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Technical team (Facilities Management / Engineering) develops specifications and plans necessary for the procurement and implementation of the JOC. Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. All cash discounts should be deducted in determining material costs.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). To qualify, the research must be conducted within California and include basic or applied research of scientific inquiry, original investigation for the advancement of scientific or engineering knowledge or improved function of a business component.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). To qualify, a taxpayer’s research must be conducted within California and include basic or applied research of scientific inquiry, original investigation for the advancement of scientific or engineering knowledge or improved function of a business component.

Income 75