Remove Fabrication Remove Feasibility Remove Legal Remove Liability
article thumbnail

Is Gravity Part of OSHA’s LOTO Regulation?

FDR Safety

Examples include: A skilled worker setting up a frame for welding and fabrication and a 400 lb. In some cases OSHA is involved and in others, there is a civil suit alleging tort liability. The only practicable and feasible means of addressing this issue is to deal with it as part of your training for the control of hazardous energy.

article thumbnail

Is Gravity Part of OSHA’s LOTO Regulation?

FDR Safety

Examples include: A skilled worker setting up a frame for welding and fabrication and a 400 lb. In some cases OSHA is involved and in others, there is a civil suit alleging tort liability. The only practicable and feasible means of addressing this issue is to deal with it as part of your training for the control of hazardous energy.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

If a business entity invests in a qualifying project that meets certain requirements and is approved by the Alabama Department of Revenue, and maintains minimum annual requirements, the company may receive an annual credit against its income tax liability generated from the qualifying project.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

It is a credit of five percent of the capital costs of a qualifying project, to be applied to the Alabama income tax liability or financial institution excise tax generated by the project income, each year for 20 years. The credit is 20 percent of the actual costs limited to the employer’s income tax liability.

Income 75
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

Four (4) areas considered as components of life-cycle assessment (LCA): 1) Materials Manufacturing: Removal of raw materials from earth, transportation of materials to the manufacturing locations, manufacture of finished or intermediate materials, building product fabrication, and packaging and distribution of building products.

BIM 40