article thumbnail

Green Home Building and Sustainable Architecture: Affordable Eco.

Natural Building

Dr.Jenny Pickerill recently traveled around the world on a Winston Churchill Trust Travelling Fellowship on a quest for information and insights on how folks in England (where she teaches at the University of Leicester) might better address needs for sustainable housing. Using pre-fabricated elements or existing structures.

Green 61
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. The fundamental day-to-day business processes of the Engineering, Construction, Owner, and Operations sector are changing.

BIM 45
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. The fundamental day-to-day business processes of the Engineering, Construction, Owner, and Operations sector are changing.

BIM 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 01 90 00 Life Cycle Activities. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 01 90 00 Life Cycle Activities. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Contractor shall furnish as part of its overhead cost, included in the coefficient, all necessary protective equipment, concrete mixing boxes, water barrels, wheelbarrows, hoes, shovels, tools, mortar boards, ladders, portable scaffolding, shop tools, hand tools, shop equipment, and fabricating items customary to the trade, etc.,