Remove Feasibility Remove Guidelines Remove Inspections Remove Visualization
article thumbnail

Evaluating OSHA’s Respiratory Protection Standard

Safety Services Company

It established that respirators are required when these effective engineering controls are not feasible. An additional fit test is required whenever the employee reports, or the employer or PLHCP makes visual observations of, changes in the employee’s physical condition that could affect respirator fit. use in emergency situations.

Safety 49
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Safety Programs

Safety Services Company

Hazard Identification and Control: Your company should perform periodic inspections and have procedures of identifying existing or potential hazards in the workplace and eliminating or controlling them. Here’s a quick checklist and guideline on how to go about it. Consult and comply with OSHA standards.

Safety 48
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. WORKFORCE DEVELOPMENT. 50,000 (max.) 150,000 (max.)

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

In addition to the qualifying expenses, at least 25 percent of the workforce on every project must be Colorado residents in order for the project to meet state incentive guidelines. Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program.

Income 75
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Implementing guidelines are set forth in FAR Subpart 16.5. GSA, through its Federal Systems Integration and Management Support Center, has awarded multiple award contracts for IT services using the new FASA guidelines. mandates that multiple awardees have a fair opportunity to be considered for orders in excess of $2,500.