Remove Feasibility Remove Inspections Remove Overhead Remove Site
article thumbnail

Everyday Employee Safety

Safety Services Company

To reduce MSD hazards, feasible engineering, work practice or administrative controls must be used. All stairways must be at least 22 inches wide, and have at least 7 feet of overhead clearance. What is my best, safest route to work or the job-site? What methods will be used at the job-site today to complete the work?

Safety 48
article thumbnail

Construction Cost Estimating Blog: Related Costs of a built.

Construction Cost Estimating

The contingency expenses for a construction may be associated with design development alterations, schedule adjustments, general administration changes (such as wage rates), contradictory site conditions for those anticipated, Third party obligations required for the duration of construction, as for example new permits.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Application: This standard applies to warehouse or large overhead rolling doors. Inspect gear box, change or add oil as required. Tool Group A.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. Site visit.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. The Owner will be required to deliver such materials to the job site or compensate the Contractor for providing labor to deliver Owner-furnished materials to the job.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.