Remove Feasibility Remove OSHA Remove Overhead Remove Software
article thumbnail

FEDERAL JOB ORDER CONTRACTING – An Outline

Building Information Management

Feasibility Analysis. Appropriateness and Feasibility Report. Software and hardware requirements / deployment methods. OSHA = Occupational Safety and Health Administration. The coefficient represents the contractor’s overhead costs and profit. Acquisition Strategy. Planning and Contract Award. Work Execution.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

All fall protection equipment is required by OSHA to be checked prior to each use. OSHA 1910.66, CALOSHA, AISC, AWS and local code requirements. Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Generally the required format is electronic, standardized, and completed using the same/similar software utilized by the Owner. All cash discounts should be deducted in determining material costs. Delivery of Proposals.