Remove Feasibility Remove Overhead Remove Permits Remove Security
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Security Bollards/Barricade. Application: This standard card applies to automatic hydraulic security Bollards/Barricades found at driveway entrances, and other areas where vehicular traffic must be controlled. Notify affected personnel before performing PM (alarmed or security entrances). Door, Manual, Overhead.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. NPI prices include only direct costs.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

A single award ID/IQ contract often makes it difficult for the government to secure the same price reductions and contractor performance improvements that would occur if the contractor was competing against other qualified contractors throughout the contract. These contracts have much of their pricing determined by pre-award competition.