Remove Guidelines Remove Negotiation Remove Overhead Remove Permits
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. The UPB costs should NOT include contractor overhead and profit. The contractor typically bears overhead costs as part of the proposed coefficient of the JOC program. Scheduling.

Contract 100
article thumbnail

What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Implementing guidelines are set forth in FAR Subpart 16.5. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions.