Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. authorization. Job Conditions.

Contract 100
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Application: This standard applies to warehouse or large overhead rolling doors. Inspect gear box, change or add oil as required. Tool Group A.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Use good judgement to ensure that travel costs do not become excessive. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 21 19 Testing and Inspecting Allowances. 01 41 26 Permit Requirements. 01 43 26 Testing and Inspecting Agency Qualifications. 01 45 23 Testing and Inspecting Services. 01 45 26 Plant Inspection Procedures. 01 21 19 Testing and Inspecting Allowances.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 21 19 Testing and Inspecting Allowances. 01 41 26 Permit Requirements. 01 43 26 Testing and Inspecting Agency Qualifications. 01 45 23 Testing and Inspecting Services. 01 45 26 Plant Inspection Procedures. 01 21 19 Testing and Inspecting Allowances.