Remove Life Cycle Remove Negotiation Remove Overhead Remove Reference
article thumbnail

Developing a Job Order Contracting Program

Building Information Management

Construction tasks not included in the unit price book may be negotiated. The difference between the facility owner’s cost based on the UPB and the contractor’s cost is represented as a coefficient which is used as a multiplier that covers the contractor’s overhead and profit as well as any adjustment between the UPB and the local prices.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

Construction tasks not included in the unit price book may be negotiated. The difference between the facility owner’s cost based on the UPB and the contractor’s cost is represented as a coefficient which is used as a multiplier that covers the contractor’s overhead and profit as well as any adjustment between the UPB and the local prices.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. Labor costs will be reimbursed to the Contractor at the unit price rate multiplied by the Contractor negotiated coefficient(s). The Contractor may be reimbursed for Subcontractor at cost plus the negotiated coefficient.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 42 00 References. 01 42 19 Reference Standards. Overhead Rapid Coiling Doors.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 42 00 References. 01 42 19 Reference Standards. Overhead Rapid Coiling Doors.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Where the potential for that exists, the term has been defined and a reference location given. To receive credit for this performance in the system, an individual will certify that they have reviewed the reference indicated – the honor system applies. o O perating, Maintaining and Testing Life Safety. Cycle Assessment (LCA).