Workers remove wall panels from a high rise to accommodate new windows for one of the many projects Englewood Construction negotiates with its clients. Be sure to check references of general contractors before entering into a negotiated or competitive bid situation. That’s a given. There’s no need to cheat to get ahead.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

Some refer to these risks as "known-unknowns" because the estimator is aware of them, and based on past experience, can even estimate their probable costs. The estimated costs of the known-unknowns is referred to by cost estimators as cost contingency. RSMeans refers to this as, "Price the quantities."

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

Each project will encompass detailed line item construction task and reference specifications encompassing improvements, alterations, renovation, remodeling, major repairs, and minor new construction associated with ORGANIZATION NAME structures and properties. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

JOB ORDER CONTRACT Glossary / Terms / Defintions – JOC , JOB ORDER CONTRACTING

Building Information Management

A selection process dependent upon multiple parameters of past performance, previous experience, references, and price. to 1.20 multiplier applied to the the total of the line items for a project or task order estimate. It typcially includes all overhead items such as. BEST VALUE. LOCATION FACTOR. contingencies.

article thumbnail

What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.

article thumbnail

Job Order Contracting – 2015

Building Information Management

If a task is not in the UPB, it can be negotiated, priced and added at any time to the book. The latter is typically referred to as a non-prepriced (NPP) line item. Low overhead cost of construction procurement and delivery. References: A Path Toward Construction Productivity – Academia.edu, July 2015. Advantages.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

Construction tasks not included in the unit price book may be negotiated. The difference between the facility owner’s cost based on the UPB and the contractor’s cost is represented as a coefficient which is used as a multiplier that covers the contractor’s overhead and profit as well as any adjustment between the UPB and the local prices.