article thumbnail

Why You Should Make 4D Construction Sequencing ‘Business as Usual’ – and How To Do It

Autodesk Construction Cloud

It provides a robust maintenance and management tool and ensures that the asset's life cycle is streamlined and sustainable. Safety improvements : For both on-site workers and members of the public, safety is of paramount importance. It enables businesses to understand, control, and minimise downtime and lost production.

article thumbnail

The high cost of low maintenance

BD+C

This article will identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance. The life cycle cost analysis provides knowledge of the concrete, environment, and structure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Specifications

Construction Cost Estimating

It consists of 50 Divisions, to be applied for integrating facility life cycle and maintenance information into the building knowledge base. Technical Specifications Divisions 02 - 16 is known as the Technical Specifications.

CSI 45
article thumbnail

Construction Specifications

Construction Cost Estimating

It consists of 50 Divisions, to be applied for integrating facility life cycle and maintenance information into the building knowledge base. Technical Specifications Divisions 02 - 16 is known as the Technical Specifications.

CSI 45
article thumbnail

Construction Cost Estimating Blog: Construction specifications - vital.

Construction Cost Estimating

It consists of 50 Divisions , to be applied for integrating facility life cycle and maintenance information into the building knowledge base. The Contractor’s Responsibility is to comprise these items in Overhead. Procedural. 01025 Measurement and Payment. 01035 Modification Procedures. 01050 Field Engineering.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

Lack of motivation for the contractor to increase performance, training, or safety. Disseminate the performance information to assist facility owners in reducing risk and life cycle costs and to motivate contractors to perform. Contractor’s safety performance (0-10): 8.7. Contractor’s safety performance.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

Lack of motivation for the contractor to increase performance, training, or safety. Disseminate the performance information to assist facility owners in reducing risk and life cycle costs and to motivate contractors to perform. Contractor’s safety performance (0-10): 8.7. Contractor’s safety performance.