Remove Modeling Remove Schedule Remove Sewer Remove Zoning
article thumbnail

Cool Planet Energy Systems Announces $168 Million Investment In Louisiana Bio-Refineries

Buisness Facilities Contributed Content

The third site is scheduled to come online in late 2016 at a Louisiana site to be determined. The company’s business model calls for developing 400 of the micro-refineries across the U.S. The City of Alexandria will provide gas, water, sewer and electrical upgrades, along with road improvements at the 30-acre Port of Alexandria site.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Enterprise Zone Credit or Exemption: The Alabama Enterprise Zone Act (Act. For a list of state economic development agencies, click this link.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. CALIFORNIA.

Income 75
article thumbnail

Advanced Manufacturing Industry: Dynamic Advancements

Buisness Facilities Contributed Content

As a designated Foreign Trade Zone (FTZ), Oswego County is designed for the convenient and cost effective production of goods. Sensors now allow the lights to turn on and off according to the shipyard’s manufacturing schedules and the High Bay LEDs greatly improved the facility’s lighting quality.

article thumbnail

Construction Equipments

The Constructor

Their deep bucket can usually store about 3-6 cubic meters (exact number varies with the model) of earth. Since the expiration of Bobcat’s patent on its quick-connect system, newer tractor models are standardizing on that popular format for front end attachments. play an important role in construction technology.

Equipment 104
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. 00 43 86 Proposed Work Plan Schedule Form. 00 01 20 List of Schedules.