Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

article thumbnail

Rory Woolsey's Construction Estimating Blog: The Estimating.

Rory Woolsey

The realities of the site such as weather, on-going operations, soils conditions, access/ egress, security, safety, site lay-out, environment protections and other context scope must be considered as well as the means and methods that the work will be executed. These all impact the overall cost of the project. construction consultants.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Rory Woolsey's Construction Estimating Blog: Losing Your Shirt.

Rory Woolsey

Think like a contractor and include the scope of means and methods for executing the work as well as the scope issues relative to the context (location, weather, traffic, safety measures, economic conditions, availability of resources…) of where the project is built. He is also affiliated with The Wool-Zee Company, Inc.,

article thumbnail

Rory Woolsey's Construction Estimating Blog: A Savings Analysis!

Rory Woolsey

With JOC the extent of the design will stop at a place where a building permit can be issued and all of the life and safety code issues are emphasized. This equates to 75 labor hours x a cost of $60 per hour (with all overhead and burdens) which equates to about 6% additional savings on a typical $80,000 JOC project.