Remove 2001 Remove Defense Remove Environment Remove Fabrication
article thumbnail

Feature Story: Aiming For The Top In Utah

Buisness Facilities Contributed Content

“Our diversified economy, an unemployment rate that’s the fourth-lowest in America, the fact that we’ve significantly raised the bar on education, an extremely productive labor force and our business-friendly environment here—this is why so many [global] companies tell us their most-requested worldwide transfer location is Utah.”.

Utah 56
article thumbnail

Construction Cost Estimating, Location Factoring, and National Average Cost Data

Job Order Contracting

The RSMeans city cost index (CCI) and the Department of Defense area cost factor (ACF) index are two primary examples of location factor publications. m (4 inches) thick slab, vapour barrier and welded wire fabric in Baton Rouge, Louisiana, United States, c oncrete was found to be underestimated by 18% and vapour barrier by as much as 67%.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

4BT OpenCost(TM) Local Market Granular Cost Data an RSmeans Alternative?

Job Order Contracting

The RSMeans city cost index (CCI) and the Department of Defense area cost factor (ACF) index are two primary examples of location factor publications. m (4 inches) thick slab, vapour barrier and welded wire fabric in Baton Rouge, Louisiana, United States, concrete was found to be underestimated by 18% and vapour barrier by as much as 67%.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. Labs 21 National Conference 2012 – “High Performance Healthcare Environments: Metrics and Procedures”. . .

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. Labs 21 National Conference 2012 – “High Performance Healthcare Environments: Metrics and Procedures”. . .

BIM 40
article thumbnail

COVER STORY: Global Biotech Report

Buisness Facilities Contributed Content

With two universities, two universities of Applied Sciences, the Max Planck Institute of Biochemistry, Neurobiology and Psychiatry and the Helmholtz Research Center for Environmental Health, the region offers an excellent environment for innovation. NBAF Bio-Defense Lab Moves Forward In Manhattan, KS. No business personal property tax.

Florida 63
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

THE ARIZONA COMPETITIVENESS PACKAGE (HB 2001) is a brand new incentive package which includes the following new incentive programs and updates: QUALITY JOBS TAX CREDIT PROGRAM: Provides Arizona income tax credits for companies creating new jobs and investing in Arizona. be at least 21 years old and have no criminal record.

Income 75