Remove 2002 Remove Design Remove Feasibility Remove Schedule
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Facility / Infrastructure Life Cycle Cost: Costs associated with designing, acquiring, constructing, adapting, maintaining, repairing, and operating a built structure. design, building and operate) is possibly a good channel to consider building life cycle. In this case, end-users are left to bear the maintenance costs.

article thumbnail

Our 2022 Builder of the Year, Van Metre Homes, Is Wired for Change

Pro Builder

or its design center, model homes, or 80,000-square-foot component manufacturing facility, and you’ll sense something very different about this builder. It’s just a matter of getting it to scale and making it economically feasible.”. Rich Binsacca, Editorial Director. Walk into Van Metre Homes’ offices in Ashburn, Va.,

Housing 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

Louisiana will provide $14 million in funding over 10 years for expanded higher-education programs designed primarily to increase the number of annual computer science graduates. The office building is scheduled for completion by spring 2015 with the residential complex following in the summer. billion over 10 years. Morris Lessmore.

Metro 110
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

TVA Economic Development Loan Fund: A multimillion-dollar revolving loan program designed to stimulate investment and job creation in the TVA region. 573), was enacted in 1987 to stimulate business and industrial growth in designated areas of the state that are considered economically depressed. In December 2002, the former U.S.

Income 108