Remove 2004 Remove Fabrication Remove Modeling Remove Visualization
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Building in this context involve the building’s fabrics, structure and engineering services. 2004), Life-cycle / whole-life costing. UK: Wiley-Blackwell. Pasquire, C. and Swaffield, L.

article thumbnail

OMNICLASS vs. UNICLASS / UNICLASS2 – BIM Ontology

Building Information Management

These would then need to map to each other and to the Work Results Table, in order to properly integrate the specification component of the building information model (BIM) along the project timeline. Fabric example. Without these object classes we cannot produce a complete ‘building’ information model. Not used. •

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Building information modeling (BIM) is beginning to fundamentally change the building industry in a very positive way. 10:00 – 11:30 AM Construction – Fabrication Integration. Dee Cramer is an industry leader in 3D CAD and Building Information Modeling. Tuesday and Wednesday: Conference Educational Sessions.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Building information modeling (BIM) is beginning to fundamentally change the building industry in a very positive way. 10:00 – 11:30 AM Construction – Fabrication Integration. Dee Cramer is an industry leader in 3D CAD and Building Information Modeling. Tuesday and Wednesday: Conference Educational Sessions.

BIM 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 54 36 Building Information Modeling Exhibit. 1995 Edition.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 54 36 Building Information Modeling Exhibit. 1995 Edition.