article thumbnail

Revit OpEd: View Discipline

Revit OpEd

Structural - Similar to architecture but hides non-load bearing walls and some hidden line behavior with respect to concrete floors/slabs and foundations. 4)All visual change a Discipline setting makes is available to the user per view. ► 2004. (2). ► December 2004. (1). ► November 2004. (1).

Revit 55
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

A central element of the public-private partnership involved in securing the IBM center is the construction of a mixed-use, riverfront complex that will be developed by Commercial Properties Realty Trust (CPRT), a real estate investment trust that manages and develops property holdings of the Baton Rouge Area Foundation (BRAF).

Metro 110
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

A recipient of the AIA National, California Council, and local chapter scholarships, ASCE National scholarships, China Synergy Program for Outstanding Youths, and SOM Foundation Traveling Fellowship among other honors and awards, Calvin received his Master’s, Engineer Degree, and Ph.D. from Stanford University. Raymond Issa, Ph.D.,

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

A recipient of the AIA National, California Council, and local chapter scholarships, ASCE National scholarships, China Synergy Program for Outstanding Youths, and SOM Foundation Traveling Fellowship among other honors and awards, Calvin received his Master’s, Engineer Degree, and Ph.D. from Stanford University. Raymond Issa, Ph.D.,

BIM 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 82 13 Foundation Performance Requirements. 1995 Edition.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 82 13 Foundation Performance Requirements. 1995 Edition.