article thumbnail

Estimating and Costing in Civil Engineering Software

Construction Cost Estimating

Construction Cost Estimating Blog. Monday, November 21, 2011. Estimating and Costing in Civil Engineering Software. Estimator is a Civil Engineering Cost Estimation and Rate Analysis software for Architects, Builders, Contractors, Engineers, etc. With Estimator 2.0 Join our estimating forum.

article thumbnail

FEATURE STORY: Game-Changer In The Heartland

Buisness Facilities Contributed Content

Located on 250 acres of land at ADM’s Decatur processing complex, the new intermodal ramp offers direct access to three Class I railroads and close proximity to four interstate highways and a major U.S. Their flexibility and standard size have made them popular worldwide with an estimated 17 million intermodal containers in the world today.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Seismic Side Effects

Business Facilities

In 2011, central Oklahoma experienced a magnitude-5.7 Late last month, a group of area residents said they’d had enough: 100 of them turned up at a meeting of the Texas Railroad Commission in Austin to protest the situation (the TRC regulates mineral energy production in Texas). On December 31, 2011 a magnitude-3.9

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

percent increase from 2011, remaining at 8.5 In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. percent increase over 2011 levels. Wilson predicts that these supply chain management improvements will continue even as higher volumes return to the market place.

article thumbnail

Deepwater Horizon: Three Years Later

Buisness Facilities Contributed Content

The British oil giant estimates its overall liability for the catastrophe could eventually top $42 billion; BP has sold off significant assets to generate cash for the payouts. While the overall scope of the settlements is still taking shape, a bureaucratic framework has been put in place to distribute these funds.

article thumbnail

INDUSTRY FOCUS: The Process of Food

Buisness Facilities Contributed Content

This involves estimating the amount of customers that will want to buy a product. In 2011, the food manufacturing sector employed almost 16,500 people with an average annual salary of $54,081. by Business Facilities in 2010 and 2011. Batch Production is when a small quantity of the product is made.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

In addition to the 800 jobs that will be created at the Baton Rouge facility over the next four years, LSU estimates the project will result in approximately 542 new indirect jobs, for a total of approximately 1,342 new, permanent jobs in the Capital Region. Total investment for the combined development is estimated to be $55 million.

Metro 110