Remove Accounting Remove Inspections Remove Overhead Remove Presentations
article thumbnail

7 Ways to Improve Construction Site Safety

Levelset

In 2019, the construction industry accounted for about 20% of all work-related fatalities in the U.S. Caught-in or between : Injuries or fatalities could occur when loose clothing gets caught in belts or pulleys while heavy equipment and foundation walls present two immovable objects that can crush or suffocate an employee.

Safety 52
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The Contractor must take these costs into account when proposing the. coefficient (reference table of allowable overhead). The UPB costs should NOT include contractor overhead and profit. The contractor typically bears overhead costs as part of the proposed coefficient of the JOC program. authorization. Job Conditions.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

According to data from the Bureau of Labor Statistics, falls accounted for more than 1 in 3 jobsite fatalities in 2019. Falls trigger a lot of OSHA safety inspections, and they account for half of the top 10 violations handed out by the Office. “Struck-by” fatalities numbered 170 in 2019 , accounting for 15.4%

Safety 52
article thumbnail

How to Start a Roofing Business: 9 Tips to Grow & Thrive

Levelset

Obtain a business bank account and any software or staff you’ll need for accounting and bookkeeping. It’s important to keep your business’ finances separate from your personal accounts. New businesses can leverage technology, automation, and lower overhead costs to compete with existing businesses.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). g) Forms, numbering and reports. (1) 5) Automated versions of forms should be used for JOC, (h) Distribution.

Contract 100
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Application: This standard applies to warehouse or large overhead rolling doors. Inspect gear box, change or add oil as required. Tool Group A.

article thumbnail

Measurement Fails in Business, Part II: Real-World Examples and Solutions

Pro Builder

I wonder how often the Pittsburgh decision-makers were overhead proclaiming “The numbers don’t lie! We use numbers to present a case, to persuade, to sell, and that’s a good and normal practice. Final inspection? Measurement Fails, Part I. Data-Driven Builders Leave the Guesswork Behind. Certificate of occupancy?

Permits 98