article thumbnail

The Future Of Construction – BIM

Lets Build

In this phase, the production and sharing of the information are taking place with the help of paper and non-interoperable electronic documents. CAD drawings are used during Level 0, but there is no sharing of the generated information models. Softwares like Aconex or Viewpoint can be used as the CDE.

BIM 168
article thumbnail

BIM 360: One small step forward for Autodesk = Two huge steps backwards for the global AEC industry

DebunkTheBIM

It also gives the perfect excuse for the introduction of a per/seat licensing that touches many more bottoms that any of the authoring software licenses ever had, even in the hay-days of the Flat-CAD, AutoCAD of the late eighties and throughout the ninetees. And BIM is going on the back seat big time.