Remove Agreement Remove Change Orders Remove Documentation Remove Overhead
article thumbnail

How Much Does Rework Really Cost Your Job and What Can You Do to Stop It?

Construction Junkie

Unsatisfied with stopping at direct cost, the researches at Navigant then turned their attention to overhead costs, which include managerial, supervisor, and site safety costs. Stakeholder Participation Early and Often Up front communication between all interested parties avoids confusion and possible changes.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

A Job Order Contract Execution Guide is a required element for any successful, best management practice JOC Program. The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. authorization. the time of award.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Adversarial, change-order-oriented environment is common between owner, A/E, and contractor. Bid shopping can occur and actual overhead and profit amounts are unknown. Change orders may be reduced versus DBB due to A/E-contractor collaboration and contractual relationship. Disadvantages. Not fully collaborative.

Design 130
article thumbnail

Lump Sum or Cost-Plus Contract: You Can’t Have It Both Ways

Best Practices Construction Law

Paragraph 47 of the contract stated that it was a “cost plus contract” with specific fees for overhead, warranty and profit to the contractor, while another part of the contract included language that the “agreed upon price is $282,000.00.”

article thumbnail

Job Order Contracting – 2015

Building Information Management

The coefficient must include not only the contractor’s overhead and profit, but also any adjustment that may be needed to the UPB prices based on the contractor’s costs in the local area of the contract(which are functions of labor costs, subcontractor base, market conditions and client-specific conditions). Key elements.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

JOC, an annual contract and multiple option year agreement for general construction, generally requires the Contractor to e furnish associated labor, tools, materials, equipment and transportation. It is generally not acceptable to split a project into more than one JOC in order to stay under the maximum amount. Unit Price Books.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build).