article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

It’s also known as AIA billing since the American Institute of Architects (AIA) produces one of the most commonly used pay applications. If using an AIA pay application form, their continuation sheet takes the place of the SOV. Receipts : If you’ve purchased materials and already paid the invoices, include the receipts.

Lien 98
article thumbnail

Navigating challenges in construction administration

BD+C

Navigating challenges in construction administration 0 qpurcell Mon, 08/28/2023 - 14:25 Building Team Vessel Architecture's Rebekah Schranck, AIA, shares how the demanding task of construction administration can be challenging, but crucial. Our AIA agreement outlines the appropriate procedures and processes for change orders.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Forms for excel

Construction Cost Estimating

The documents and forms resemble the AIA (American Institute of Architects) and AGC (Associated General Contractors) formats, saving valuable time as they can be customized to suit specific needs while maintaining the standard verbage.

Lien 45
article thumbnail

#117:  Building Information Modeling

NH Construction Law

Depending on how the parties agree on the protocols for and the extent of permissible reliance on shared BIM in constructing a project, BIM models can run the gamut from serving as a check on accuracy of traditional 2D plans to replacing those plans as the official project drawings, or anything in between.

article thumbnail

How Working with a Design-Build Construction Firm Can Boost the Bottom Line

HardHatChat

As a former architect and member of the AIA, this couldn’t make me happier. An architect may dream up an architecturally significant commercial construction project, but once a commercial general contractor takes a look at the drawings and the proposed site, a different reality may have to be addressed. Less responsibility for owners.

Design 120
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

These negotiations must precede the JO award/approval and are not allowed on a Change Order basis. This action will require a modification to the JO to reflect a change order credit. It is the sole responsibility of ORGANIZATION NAME to authorize a Change Order to a JO. of Change Order is required.

Contract 100
article thumbnail

Less than 20% of Green Building Contracts Properly Drafted

Green Building Law Update

Of note, this review was not looking for and did not compile missed signatures, not compiled change orders or other clerical errors. In some of those instances, the parties used an AIA Contract Documents form (the wrong form) but not a Sustainable Project form. Only 1% used the ConsensusDOCS Green Building Addendum.

Drafting 120