article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

This is an example of Job Order Contracting from a legal perspective and that of a school district in Texas. FACILITIES CONSTRUCTION CVF JOB ORDER CONTRACTS (LEGAL) DATE ISSUED: 10/9/2013 1 of 3 UPDATE 98 CVF(LEGAL)-P. FACILITIES CONSTRUCTION CVF JOB ORDER CONTRACTS (LEGAL) DATE ISSUED: 10/9/2013 1 of 3 UPDATE 98 CVF(LEGAL)-P.

Legal 520
article thumbnail

Hensel Phelps wins $327M Nashville airport terminal design-build contract

Construction Dive

The firm's contracts at the Tennessee airport now total $567 million, or nearly half of the value of the facility's $1.2 billion expansion.

Airports 116
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Aecom, partner win design contract for $750M Boston Logan Airport project

Construction Dive

This is the second huge project contract awarded this month to Aecom, which is collaborating on the Logan airport design with Luis Vidal & Architects.

article thumbnail

Messer Construction wins $144M Nashville airport design-build contract

Construction Dive

Messer's terminal parking garage and airport administrative office building represent one contract in a broader $1.2 billion expansion.

article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. km² platform.

Airports 203
article thumbnail

Long Beach Augments Airport Terminal Improvement Contract

ENR Construction

The extra funds will be added to an existing $65-million design-build contract awarded to Swinerton Builders in 2018.

article thumbnail

Airports Ponder Short and Long-Term Implications of COVID-19

ENR Construction

The design team for Pittsburgh International Airport’s planned 650,000-sq-ft new terminal had nearly reached the 60% design mark in March, and the owner was preparing to release preparatory enabling contracts.