Remove Airports Remove Design Remove Documentation Remove Risk
article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. km² platform.

Airports 203
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage Risk 

Autodesk Construction Cloud

And with good reason: the right insights can improve everything from project cost and timeline accuracy to reducing the risk of lawsuits and disputes, and even winning more business. Or implementing new safety training to mitigate worker injury risk You can then use that knowledge to anticipate and better manage risk for future jobs.

Risk 52
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes of fixed cement-aggregate ratio which ensures adequate strength are termed nominal mixes.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

How Autodesk Build Enables EuroAirport to Manage its Assets Digitally

Autodesk Construction Cloud

By using Autodesk Build , an Autodesk Construction Cloud solution, the French-Swiss airport Basel-Mulhouse-Freiburg can now save 360 days of worker hours when planning its equipment maintenance. In an airport, runway maintenance work is carried out at night. Each area is composed of several toilet and sink units.

article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 114