Remove Airports Remove Document Remove Documentation Remove Procurement
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. The follow elements are common to a credible construction cost estimate.

article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. kmĀ² platform.

Airports 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting ā€“ The Legal Side

Building Information Management

Job order contractingā€ is a procurement method used for maintenance, repair, alteration, renovation, remediation, or minor construction of a facility when the work is of a recurring nature but the delivery times, type, and quantities of work required are indefinite. (source: [link]. Magnolia ISD 170906. This policy does not apply to: 1.

Legal 520
article thumbnail

BIM ā€“ Attempting to Run before you can Walk? ā€“ BIM EU-wide Procurement Initiative

Building Information Management

more efficient procurement and management of the existing numerous renovation, repair, sustainability, and minor new construction projects required to meet sustainability and economic imperatives. federal departments/agencies, as well as state/county/local governments, colleges/universities, healthcare, and airports/transportation.

BIM 40
article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? All rights reserved.

America 203
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Closing down the project: Once the execution of the project is completed, the project team evaluates the team’s performance, documents related to the project are achieved, lessons learned form the experiences in the project is captured and celebrate the project’s completion.

article thumbnail

U.S. Construction ā€“ Improving Efficiency & Competitiveness

Building Information Management

Segmented, linear, and non-integrated processes: planning, financing, design, engineering, procurement, construction, operations, and maintenance. Studies document 25 to 50 percent waste in coordinating construction labor and in managing, moving, and installing materials (Tulacz and Armistead, 2007); losses of $15.6