article thumbnail

REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

The required amount of cover will always be specified on the design drawings, but no time should the cover be less than the maximum size of aggregate plus 5mm. The second part is carried out by a surveyor, who will check the steel levels against the required levels from the design drawings.

Concrete 250
article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

From design and VDC professionals to business and project managers, these construction leaders aren't just building structures and facilities—they're shaping our world. Today, he leads a team that solves complex problems every day and improves project workflows.”

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Successful Commercial Construction Strategies and Operations: Tip #1

HardHatChat

How did you file the documents for your last commercial construction project? Did your general contractor give you a big fat binder of information including your warranty letters, operating manuals, as-built drawings, etc? By moving to a paperless project management software system. I know it was for me.

article thumbnail

Free Interior Design Softwares

The Constructor

The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics). Can you please give the detail drawings showing the arrangements of consecutive layers of bricks? What will be the total thicknesses of the walls?This

Software 114
article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

For anything other than most smallest of concreting jobs e.g. walls over 1m in height, a drawing should be provided, showing what formwork is required. This need not be an intricate design drawing, a simple sketch is usually sufficient. The below picture shows part of a concrete structure soon after the formwork has been struck.

Concrete 223
article thumbnail

STAAD PRO MANUELS & GUIDES

The Constructor

Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? RECOMMENDED FOR YOU BASIC DRAWING COMMANDS FOR AUTOCAD Close He is the founder of The Constructor and works in a reputed construction company. All rights reserved.

Concrete 115
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

8) inadequate preparation and review of contract and shop drawings. (9) Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? 6) complexity of codes and specifications leading to misinterpretation and misapplication. (7)

Concrete 177