Remove ArchiCAD Remove Life Cycle Remove Products Remove Risk
article thumbnail

BIM Construction Cost Estimating – Top Ten List

Building Information Management

First and foremost BIM is the life-cycle management of the built environment supported by digital technology. While the industry is currently fixated upon 3D visualization tools, aka Revit, Archicad, Bentely… they only represent components of a BIM solution. Metrics and Benchmarks – Time, Accuracy, Cost.

article thumbnail

The Legal Aspects of BIM

Building Information Management

BIM is the efficient full life cycle operation of the built environment, with the promise of managing Total Cost of Ownership (TCO) and associated physical and functional conditions in concert with an organization’s changing needs. BIM is NOT 3D modeling (Revit, Archicad, Bentley, etc.), Appropriate distribution of risk.

Legal 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Legal Aspects of BIM

Building Information Management

BIM is the efficient full life cycle operation of the built environment, with the promise of managing Total Cost of Ownership (TCO) and associated physical and functional conditions in concert with an organization’s changing needs. BIM is NOT 3D modeling (Revit, Archicad, Bentley, etc.), Appropriate distribution of risk.

Legal 40
article thumbnail

BIM Strategy- Why Everything, or Nothing Ever, Changes!

Building Information Management

BIM is the life-cycle modeling and management of the built environment supported by digital technology. First, a few clarifications and items to help frame this discussion: BIM definition: “BIM is the life-cycle modeling and management of the built environment supported by digital technology.” INTRODUCTION.

BIM 74
article thumbnail

BIM, Productivity, Architecture, Engineering, and Construction.

Building Information Management

Stress and lack of productivity are largely related to several factors: uncertainty, poor communication/collaboration, improperly assigned time factors, etc., Can undue stress, uncertainty, risk, etc. Can productivity and transparency be improved? was right…it’s all relative. and thus can only be mitigated.

BIM 40
article thumbnail

BIM, Productivity, Architecture, Engineering, and Construction.

Building Information Management

Stress and lack of productivity are largely related to several factors: uncertainty, poor communication/collaboration, improperly assigned time factors, etc., Can undue stress, uncertainty, risk, etc. Can productivity and transparency be improved? was right…it’s all relative. and thus can only be mitigated.

BIM 40
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Led CAD selection and implementation projects transitioning FM Global from pencil/paper-pen/linen to electronic production. This has included products from GDS, ESRI, MapInfo and Cadcorp.

BIM 45