Remove Architecture Remove Change Orders Remove Design Remove Life Cycle
article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

As a result, staggering levels of economic and environmental waster are common across the architectural, engineering, construction, operations, and owner groups. LEAN methods provide a proven integrated, coordinated, and efficient way to manage all project and program phases (from design through construction, into operation, and beyond).

article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

Mike White , Director of Design and Construction at North Point Hospitality (NPH) , is one individual who possesses these traits and abilities. I initially started at North Point, managing projects, then moved to Senior Project Manager and ultimately the Director of Design and Construction. I'll start at the beginning—my family.

Design 80
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

OpenJOC uses common, standardized terms, definitions, and data architectures (CSI Masterformat licensee) to minimize cross discipline data gaps and errors and to improve collaboration. Proven collaborative LEAN Collaborative construction delivery best management practices, Standardized terms, definition, and data architectures.

Contract 100
article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

As a result of 1800+ tests, researchers have concluded that a primary cause in low project performance (time, cost and customer satisfaction) is the traditional owner-vendor relationship in which the owner uses a design, bid and build (DBB) approach. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

Optimize Facility Renovation, Repair, and Construction Delivery with Robust Business Processes

Building Information Management

They remain plagued by low productivity, a low-bid/change-order mentality, and adversarial relationships among all construction project participants. This level of performance remains unmatched by traditional design-bid-build, CM@R, or design-build. Many AEC organizations find these objectives difficult to achieve.

article thumbnail

Optimize Facility Renovation, Repair, and Construction Delivery with Robust Business Processes

Building Information Management

They remain plagued by low productivity, a low-bid/change-order mentality, and adversarial relationships among all construction project participants. This level of performance remains unmatched by traditional design-bid-build, CM@R, or design-build. Many AEC organizations find these objectives difficult to achieve.