Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Organizations that provide leadership and commitment to collaborative environments are rare. Reduced project related cost growth per change order. Conceptual model of partnering and alliancing. Engineering, Construction and Architectural Management, 19(4), 342-368. 2004; Black et al., 2000; Grajek et al.,

article thumbnail

Construction is NOT complex…. People are. Successful Construction Project Delivery Requirements

Job Order Contracting

Only improved early and ongoing collaboration and communication across all participants and stakeholders has proven to reduce errors and omissions, minimize the number of change orders, shorten overall project delivery times, improve quality, and reduce total project costs.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

This obstacle can only be overcome by changing current formal education and professional training programs. Educational and training programs must focus upon asset life-cycle management and modeling. Timely, accurate, repeatable, and verifiable information based upon standardized terms, definitions, and data architectures.

article thumbnail

Integrated project delivery method

Job Order Contracting

A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. . At detailed line item level, an example being the CSI Masterformat data architecture. They are aware of the traditional waste and productivity issues and are beginning to demand change.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

As a result, staggering levels of economic and environmental waster are common across the architectural, engineering, construction, operations, and owner groups. There are currently at least three proven LEAN methods relevant to this discussion: Life-cycle total cost-of-ownership modeling and management. Job Order Contracting.

article thumbnail

Latest software for estimating & designing architectural projects

Construction Cost Estimating

Latest software for estimating & designing architectural projects. At the time of design phase, accurate estimation can help architect to cut costs, remove RFIs, potential change orders and other supplementary costs that may arise throughout the actual building stage. Construction Cost Estimating Blog. adsense analytic.

article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

No one model is perfect; all have benefits and drawbacks. Many methods of project delivery exist, but most are variations of the five models we’ll describe below. This can slow the construction process or create the need for change orders. In the design-build model, the design and construction are handled by one firm.

Risk 52