Remove Architecture Remove Documentation Remove Risk Remove Roads
article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

The opportunities and constraints inherent to a site and the response to a program/design brief are analysed and documented in an overall site planning document that should accompany a development application. Site planning in architecture and landscape architecture refers to the organizational stage of the landscape design process.

Site 118
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., Engineering, Construction and Architectural Management, 19(4), 342-368. Engineering, Construction and Architectural Management, 18(5), 444-461. development.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Project Closeout

cnstrctr

In order to get occupancy you need a number of documents from your consultants and various agencies but ultimately it’s the building inspector who grants occupancy. Some of the documents they will be looking for include: Letters from each of the consultants confirming that the project is built to drawings and specs.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Team members monitor and control progress in terms of cost, time, and quality; and manage risk. Executing the project: In this phase of the project, team is ready to launch the project. If the project work is not carried out as per schedules, and execution is well behind the schedule, then cost and quality of the project will be effected.

article thumbnail

Oresund Bridge

The Constructor

It is the longest combined road and rail bridge in Europe and connects the two metropolitan areas of the Öresund Region: the Danish capital of Copenhagen and the Swedish city of Malmo. The international European route E20 runs across the bridge and through the tunnel via the two lane motorway, as does the Oresund Railway Line.

Concrete 114
article thumbnail

TEMPERATURE EFFECTS ON CONCRETE

The Constructor

Knowledge of the magnitude of the thermal movement is necessary to evaluate the risk of thermal cracking in situations where large thermal gradients are likely to occur, and to calculate dimensional changes in structures such as bridge decks. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

Concrete 194
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

The items that will need maintenance and or replacement include: Bearings Waterproofing membranes Road surfacing Movement joints Parapets The road surfacing will have to be replaced over long stretches of the carriageway. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.