Collaboration in Construction Matters

Job Order Contracting

Compare those numbers to the AECOO (architecture, engineering, construction, operations, and owner) average of 70-72% of project over budget and over schedule! Leave design-bid-build and even design-build behind if you truly want to maximize your limited facilities management resource to the betterment of your organization.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

The way to deliver 96%+ of renovation, repair, and maintenance projects on-time, on-budget, and at the appropriate level of quality is to enable collaboration with contractors and other expert service providers. Educational and training programs must focus upon asset life-cycle management and modeling.

article thumbnail

Facilities Operations & Maintenance Management

Job Order Contracting

Budgeting/Capital Planning. Budgeting/Capital Planning. Post construction costs average 80% of total facilities investment thus emphasis upon O &M budgeting and capital planning provides major benefits. Procurement/bidding. Facilities Operations & Maintenance Management considerations span several areas.

article thumbnail

Some useful methods for construction cost estimation

Construction Cost Estimating

A detailed cost estimate presents information to owners, architects, and builders about the facility and the project budget throughout the design phase. Statistical analysis is performed on the data to discover connections between cost drivers and other system parameters, for example design or performance parameters. Top-down estimate.

article thumbnail

Overcoming Common Facilities Management Challenges – 2019 and Beyond!

Job Order Contracting

Common Facilities Management Challenges: Limited Budget Limited Resources & Staff Deferred Maintenance Prioritizing Projects Meeting Project Timelines. By reducing waste, existing budgets and staff can be optimized. and statistically highly significant as P < 0.001 (less than one in a thousand chance of being wrong).

article thumbnail

Collaborative Construction Contracts Drive BIM, not Technology

Job Order Contracting

BIM, the life-cycle management of the built environment supported by digital technologies, holds promise, yet remains elusive to many. As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards. Introduction.