Consistent Delivery of On-time, On-Budget, Quality Renovation, Repair, and Construction

Job Order Contracting

Best Value Procurement Competitively Bid. Best Value Procurement Competitively Bid. Associated Documents and Reports (JOC Operations Manual, Notice to Bidders, Bid Forms, RFP, Proposal Form, Negotiations Records, Close-out Form/Package). Minimum and Maximum Dollar Values (Per Contract, Per Job/Task Order).

Budgeting 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). The UPB costs should NOT include contractor overhead and profit. Field Office Expense.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract / Job Order Contracting – JOC: Do’s – Don’ts

Job Order Contracting

Design-bid-build, design-build, CM@R can’t match this level of productivity or success. Follow Job Order Contract requirements with respect to bonding and overhead related costs. As an Owner, negotiate openly and fairly with the Contractor on individual JOC projects / task orders. don’t engage in “bid shopping”.).

Contract 100
article thumbnail

What is JOC – JOB ORDER CONTRACTING? A JOB ORDER CONTRACT?

Building Information Management

JOC is flexible and responsive and reduces engineering and procurement lead times. The contract includes a unit price book (UPB) that establishes a unit price to be paid for each of a multitude of construction line items including pre-priced/pre-negotiated items of work and materials. – INCOM 2009. – Tex.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The competitive low-bid award system motivates contractors to do minimal quality work that meets the minimal requirements of the specifications. Introduction.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The competitive low-bid award system motivates contractors to do minimal quality work that meets the minimal requirements of the specifications. Introduction.

article thumbnail

Rory Woolsey's Construction Estimating Blog: A Savings Analysis!

Rory Woolsey

However, I received many comments and questions on the “Negotiating JOC” blog from last week that really should be answered. Ed Carrigan asked: “Do you believe there is a savings between JOC program and a bidding process (design-bid-build)? ” Thanks for the question, Ed.