Remove BIM Remove Budget Remove Change Orders Remove Life Cycle
article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. The “gorilla in the room” is that less than 5% of real property owners both understand and practice total cost of ownership life-cycle asset management. The post Why the BIM Revolution Fizzled appeared first on 4BT.

BIM 100
article thumbnail

LEAN JOC – Job Order Contracting

Job Order Contracting

LEAN JOC (Job Order Contracting) is a robust integrated project delivery process for repair, renovation, maintenance, sustainability, and “minor” new construction. A LEAN JOC implementation integrates People, Process, Information, and collaborative Technology to consistently yield quality projects on-time and on-budget.

Contract 132
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Job Order Contracting. The Obstacles.

article thumbnail

BEST VALUE & COMPLIANT Construction Planning, Procurement, And Project Delivery

Job Order Contracting

They consistently enable predictable project outcomes including the ongoing delivery of quality repair, renovation, and new construction projects on-time and on-budget. With LEAN, best value deployment 90%+ of all repair, renovation, and new construction projects are delivered on-time, on-budget, and to the satisfaction of all participants.

article thumbnail

BIM and The Role of a Construction Cost Estimator

Building Information Management

Professional construction cost estimators are critical to any collaborative, transparent, and productive BIM solution. Owners, AEs, Contractors, Sub-Contractors, Oversight Groups, Business Product Manufacturers- BPMs, and the Community will all gain higher visibility into life-cycle needs and impacts of the built environment.

article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

OpenJOC leverages processes, standardized cost data , and technology to drive win-win relationships among all project participants and on-time, on-budget, quality construction outcomes. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management. BIM, PROJECT DELIVERY METHODS, WASTE, & LACK OF LEADERSHIP.

Contract 100