Remove BIM Remove Change Orders Remove Environment Remove Life Cycle
article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. The “gorilla in the room” is that less than 5% of real property owners both understand and practice total cost of ownership life-cycle asset management. The post Why the BIM Revolution Fizzled appeared first on 4BT.

BIM 100
article thumbnail

LEAN JOC – Job Order Contracting

Job Order Contracting

Public and private sector real property owners and facilities management professionals can leverage LEAN JOC to achieve more efficient use of existing capital resources in a full transparent and compliant planning and operating environment. The approach invests more resources earlier in the Project life-cycle.

Contract 132
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Multiple competencies/disciplines, business domains, and technologies are required to to ensure optimal functionality of the built environment. There are currently at least three proven LEAN methods relevant to this discussion: Life-cycle total cost-of-ownership modeling and management. Job Order Contracting.

article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

Field specific variables, such as weather, on-going operations, soils conditions, security, safety, site lay-out, environment protections and other contexts must be considered as well as the means and methods of work execution. A “FACEBOOK for Facilities Construction and Life-cycle Operations” is on the horizon.

article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. BIM/ BIM EXECUTION PLAN. BIM/ BIM EXECUTION PLAN. The plan describes how BIM will be implemented and which goals will be pursued.

BIM 40
article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

BIM and Cloud Computing – Get Beyond 3D Visualization and Focus Upon the “I”

Building Information Management

BIM and the Cloud – SAME 2012 – 4Clicks Solutions LLC – PDF. BIM - CLOUD COMPUTING. . BIM (Building Information Technology) and THE CLOUD (Cloud Computing) are disruptive technologies converging to significantly alter traditional construction and facility management practices. Definition of BIM. .

BIM 78