Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. BIM/ BIM EXECUTION PLAN. BIM/ BIM EXECUTION PLAN. The plan describes how BIM will be implemented and which goals will be pursued.

BIM 40
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and Operations). BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Why the majority of CMMS System Implemenations Fail

Building Information Management

For example, virtually none of the major (or even minor) CMMS or IWMS technology vendors incorporate a standardized cost database, such as RSMeans, from which users could compare their actual material, equipment, and labor costs against a localized reference standard. “Just plain stupid”, right? That’s the hard question.

article thumbnail

Collaboration, Transparency, Accuracy, Process, and supporting Technology – The Keys to Improved Productivity for Building Construction, Renovation, Repair, and Sustainability

Building Information Management

While its true that cloud computing is an enabler, with its role to support the cost effective integration of various knowledge domains and technology silos; the underlies processes linked to a collaborative project delivery method focused upon life-cycle management is the critical aspect.

article thumbnail

What Is a Digital Twin? 

Autodesk Construction Cloud

A digital replica can breathe ‘life’ into a project, and the resulting built asset. This proposition has driven our BIM adoption and implementation journey for the past two decades. This connected system can improve the asset’s entire life cycle from the pre-project stage to the end-of-life stage.

BIM 98
article thumbnail

The Value of NBIMS = The Value of BIM?

Building Information Management

The primary focus of the NBIMS-USâ„¢ is to provide open standards to transform the currently inefficient and ineffective life-cycle management of the built environment… Is this not the same value provided by BIM? Identify specific reference standards that are used for BIM. Building Owner Perspective.

BIM 45
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. 00 63 63 Change Order Form. 00 93 57 Record Change Order Requests. 00 94 33 Record Minor Changes in the Work. 01 26 39 Field Orders.