LEAN Construction Project Delivery and Facilities Operations, Maintenance, and Life-cycle Management

Job Order Contracting

Clearly defined and documented roles, responsibilities, workflows. Life-cycle Management. COBie is an information exchange specification for the life-cycle capture and delivery of information needed by facility managers. Focus upon client requirements and best value outcomes. Shared, performance-based risk/reward.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FREE Cloud-based Construction Collaboration Tool

Job Order Contracting

Reduce costs and improve efficiency for buildings and infrastructure projects by consolidating and seamlessly exchanging information throughout the design, procure, build, and operations life-cycle. Information can be contained within 2D drawings, specifications, documents, and Building Information Models (BIM).

article thumbnail

The Reasons BIM is Going Nowhere Fast

Building Information Management

July 16th, 2012 – NIBS Report - National Institute of Building Sciences Consultative Council . Per the NIBS Consultative Council there are four areas where our industry needs to focus highlights four in order to improve buildings and infrastructure. Defining High-Performance and Common Metrics. Sustainability.

BIM 81
article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

That said proper and well-defined relationships must be established, documented, and maintained from the day one, and a competent Owner with good leadership skills plays a vital role. In some cases, consultants are hired to assist in managing a Job Order Contract. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management.

Contract 100
article thumbnail

Job Order Contracting Program Implementation Strategy

Job Order Contracting

Remember that a Job Order Contract can be designed, implemented, and managed by the Owner, a combination of an Owner and a JOC Consultant, or JOC task orders can be executed leveraging a Cooperatives. Job Order Contract Documents. Contact multiple JOC consultants and vendors. Here is a outline of a few items to be considered.

Contract 100
article thumbnail

BEST VALUE & COMPLIANT Construction Planning, Procurement, And Project Delivery

Job Order Contracting

Far too much focus has been upon so called “technology solutions” such as BIM, and far to little upon LEAN process and total cost of ownership asset management methods. minimal long term reliance upon “consultants” for operational support. Unfortunately the answers is simple. What is LEAN Construction?