Remove Budget Remove Change Orders Remove Legal Remove Life Cycle
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste.

article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The primary challenges facing the AECOO sector are due to lack of owner leadership and competency… The adoption of BIM as a tool to efficiently manage the life-cycle of built structures requires a full understanding of LEAN collaborative processes as they apply to asset total cost of ownership. The buck stops with owners.

BIM 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Job Order Contracting. The Benefits .

article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

OpenJOC Job Order Contracting Framework embeds LEAN best management practices and Key Performance Indicators (KPIs) for cost, performance, and time, with an overall focus upon best value outcomes. Deliver construction projects on-time, on-budget, and to the satisfaction of owners. This is accomplished through the integration of.

Contract 100
article thumbnail

The Myth of Facility Management Outsourcing

Building Information Management

Sure, its true that many owners lack the education, skills, and capability to consistently execute efficient life-cycle management across their building portfolio, many service providers are in the same position. 90%+ Project On-time & On-Budget. 90%+ Project On-time & On-Budget. Significantly Fewer Change Orders.

article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

OpenJOC leverages processes, standardized cost data , and technology to drive win-win relationships among all project participants and on-time, on-budget, quality construction outcomes. They drive lower overall costs and virtually eliminate legal disputes. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management.

Contract 100
article thumbnail

Crumbling Buildings, Roads, and Dams – Money Isn’t the Problem

Building Information Management

Overall, fewer than 10% of renovation, repair, or new construction projects are completed on-time, and on-budget, not to mention to the satisfaction of participants and users. Furthermore the overall construction process generally wastes 30%-60% of funds on delays, change orders, reworks, low productivity, and legal disputes.

Roads 40