Remove Budget Remove Drafting Remove Mobility Remove Visualization
article thumbnail

Autodesk Build Gets 25+ Product Updates, Features, and Enhancements

Autodesk Construction Cloud

Access to project files on mobile. Save unfinished workflows as drafts. Budget code segment variable length** . Visual enhancement to payment application document templates. RFIs | Comment on and export RFI’s on mobile. All required fields do not need to be filled for the draft to be saved. Submittals.

article thumbnail

35+ New Product Updates for Autodesk Construction Cloud

Autodesk Construction Cloud

Reviews | Save unfinished workflows as drafts – When creating a new workflow, members can save unfinished workflows as a draft, reducing duplication of work and time. All required fields do not need to be filled for the draft to be saved. As well, members can now preview PDF reports on mobile.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

This software can help in drafting & documenting, designing, visualizing & analyzing & so on. Software Required for Drafting or Drawing. Software Required for Drafting or Drawing: The types of Software Required for Drafting or Drawing are as follows. #1a. TurboCAD Designer 2D Drafting Design.

article thumbnail

Autodesk Build Gets 20+ Product Updates, Features, and Enhancements

Autodesk Construction Cloud

View and edit custom fields on mobile. Submittals | View linked markups on mobile. Forms | Forms tab UI revamp on mobile. Users can also integrate Schedule with Cost in Autodesk Build to improve budgeting and planning for schedule-related costs. . RFIs | View and edit custom fields on mobile. Enhanced references.

article thumbnail

35+ Product Updates for Autodesk Construction Cloud

Autodesk Construction Cloud

Users will now get a better understanding, and visualization, of their 2D drawings and 3D Models with hypermodel viewing and alignment. Users can also integrate Schedule with Cost in Autodesk Build to improve budgeting and planning for schedule-related costs. . RFIs | View and edit custom fields on mobile. Coming early October.

article thumbnail

40 Under 40: Champions of Construction 2023

Autodesk Construction Cloud

Georgia has also been able to visualize critical data and information at a project and cross-project level using Power BI to ensure proper reporting at all levels of Clancy & Theys. His data visualization prowess has fostered a culture of transparency and accountability at multiple levels of the business.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

via Four BT, LLC – 4BT enables owners to consistently deliver quality facilities repair, renovation, and minor new construction projects on-demand, on-time, and on-budget. Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. ARCS-BAR-01-06M Frequency: Semi-annually.