Remove CA Remove Feasibility Remove Leases Remove Regulation
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

During construction of the new riverfront complex, IBM will be temporarily lease space at the Essen Centre office complex in Baton Rouge. Jindal said the company is examining the feasibility of additional Louisiana projects that would bring the total new capital investment at its sites in the state to $1.2 billion over 10 years.

Metro 110
article thumbnail

FEDERAL JOB ORDER CONTRACTING – An Outline

Building Information Management

Feasibility Analysis. Appropriateness and Feasibility Report. AFARS = Army Federal Acquisition Regulation Supplement. CA = Commercial Activity. FAR = Federal Acquisition Regulation. The acquiring by contract with appropriated funds for supplies or services (including construction) through purchase or lease.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. The program offers the following incentives: Transaction Privilege Tax Exemption (TPT Exemption) on purchased qualifying equipment and leased or rented qualifying equipment.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check throw regulator and spring assembly for tightness. Check operation of all relays, pilot valves, and pressure regulators. Verify correct main line pressure leaving the main line air regulator. If the pressure is not correct adjust or repair the regulator 3. Replace washers and/or “o” rings if required. Electrolyte.