Remove CAD Remove Comparison Remove Drawings Remove Estimating
article thumbnail

Construction Collaboration: PDF Secrets Part 1 – Estimating Takeoff

Carol Hagen

To help change that I’ll share some best practices and features that contractors, architects and estimators perhaps weren’t aware of. This includes: Calibrate the drawing or set the scale, use measurement annotations for area, length, volume and counts, and perform further calculation with your takeoff data.

article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

DebunkTheBIM: ?Explain yourself!?

DebunkTheBIM

“The first step of the plan was to demonstrate the value of BIM with an apples-to-apples project analysis, comparing a just-finished renovation using CAD with a second one using BIM.” No one seems capable (in the olde tymes we estimated hours per drawing sheet - quite simple and elegant really.) Your thoughts?

BIM 48
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Note all deteriorated areas on the roof plan for comparison later on the roof. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Check Points: 1.