Remove CAD Remove Comparison Remove Modeling Remove Schedule
article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.

article thumbnail

Trade coordination: how to coordinate technical teams on site efficiently without BIM

Lets Build

Today, construction teams rely on Building Information Modeling (BIM) to create and manage information during the entire lifecycle of a project. It brings architects, engineers, developers, contractors, manufacturers, and other professionals together to work within one 3D model.

BIM 148
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Trade coordination: how to coordinate technical teams on site efficiently without BIM

Lets Build

Today, construction teams rely on Building Information Modeling (BIM) to create and manage information during the entire lifecycle of a project. It brings architects, engineers, developers, contractors, manufacturers, and other professionals together to work within one 3D model.

BIM 78
article thumbnail

Accuracy

Revit OpEd

Every now and then we get nervous about the results we see in schedules or in dimensions. They exported from Revit so they could examine the model against others with Navisworks. Revit uses double precision numbers for all calculations (as do all CAD systems), and they are only good to around 14 or 15 digits.

Revit 45
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.