Remove CAD Remove Drawings Remove Sewer Remove Site
article thumbnail

How to plan your warehouse layout

The Korte Company

As we discuss the multitude of factors influencing the layout of a warehouse, we’ll share stories from past warehouse construction projects and actual drawings made during the early stages of projects to illustrate how discussions about these important assets turn into plans on paper. See the drawings here if you want to skip ahead.

Plans 75
article thumbnail

Revit Beginners: Utility Lines Workaround

Revit Beginners

This workaround involves drawing a repeating detail line (with imported text) on top of a simple detail line. Now draw a detail line in any view of your project. Draw your repeating detail over your new detail line as though tracing the detail line. National CAD Standards. CAD Digest. Knowing CAD.

Revit 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Global AEC is limping, hobbling. It should be handed over to our children. Turn it back into a viable career choice and let them thrive and contribute to its recovery!

DebunkTheBIM

Nathan Zraicat looks proudly over the Melbourne construction site as the photo gets taken (REF 01), with his hardhat, safety vest and glasses, a poster boy for the AEC industry and the company he works for, Leighton. The second group, a small minority would also say ‘no it is not’ but would not believe or live by this statement.

Roads 53
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Manhole, Sewer. Application: This standard applies to manholes which contain sanitary sewer lines or other related piping systems. Examine structural features of sewer line, interior of manhole, manhole frame and cover, etc. Application This applies to large trash compactors set an the site to handle building waste.