article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). David Quigley , East Coast CAD/CAM. .

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). David Quigley , East Coast CAD/CAM. .

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

20 construction industry trends to watch in 2020

Building Radar

But even beyond BIM, the cloud in the construction industry enables a shared team room as an online workspace – also via mobile devices – for correspondence, documentation and archiving, making project work much easier. In the best case, the idea of sustainability is pursued throughout all phases of the building life cycle.

article thumbnail

Cover Story: Global Biotech Report

Buisness Facilities Contributed Content

It is closely connected with a wide range of incubator and growth facilities ideal for all stages of a company’s life cycle. Services cover the spectrum of clinical trial feasibility, study design, study mobilization, study management, data linkage, real world evidence and analysis and reporting.