Remove Certification Remove Commissioning Remove Drawings Remove Leases
article thumbnail

M&V, MBCx, WTF: Building Performance Monitoring as a Means to Achieve Decarbonization Goals

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets. Design] Develop a monitoring strategy and plan.

article thumbnail

AEE WEST 2023: Building Performance Monitoring

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets. Design] Develop a monitoring strategy and plan.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

But draw your own conclusions: This 2018 IgCC contains requirements that address site sustainability, water use efficiency, energy efficiency, indoor environmental quality, materials and resources, and construction and plans for operation. Many code officials have concluded the 2018 IgCC is not a good building code, green or otherwise.

Green 156
article thumbnail

FEATURE STORY: High-Tech Hubs Are Moving To Their Markets

Buisness Facilities Contributed Content

Google Fiber is another lifestyle asset to draw talented engineers and developers to our region,” said Ryan Weber, President of KCnext, a non-profit industry advocacy group for technology in the region. Ceva will be the ninth company in the KBA facility, which is 80 percent leased. IceCure Medical is leasing space in GCIC’s 50,000 sq.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

LEED Certification, and LEED in general has been a GREAT marketing tool. If GSA, as the “landlord of the federal government,” were to require or use something else, it would add cost to the building and leasing process across the building industry. Chatham County Commission. Drawing Conclusions LLC. How can that be?

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. The program offers the following incentives: Transaction Privilege Tax Exemption (TPT Exemption) on purchased qualifying equipment and leased or rented qualifying equipment.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Obtain a current one-line drawing and verify meter is connected to the proper circuit.