article thumbnail

A Day in the Life of a Green Building Attorney

Green Building Law Update

Responding to client email about impact of construction project change order on contemplated LEED certification, so that payment can be released today. Responding to consultant email and draft report of Phase II environmental site assessment. Drafting form contract for LEED consultant to use in responding to RFPs. 04:00 p.m.

Green 149
article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

ft) flame under controlled conditions of draft and temperature onto the surface of a 7.4-m million-sf) panelized roof system using interior FRT lumber and plywood in Phoenix, Arizona. Fire performance is evaluated using UL 723, Standard for Test for Surface Burning Characteristics of Building Materials. The test consists of a 7.6-m

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

If applying for a transferable credit certificate, no more than half the credit may be applied in a single calendar year. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.”

Income 108