article thumbnail

A Day in the Life of a Green Building Attorney

Green Building Law Update

Responding to consultant email and draft report of Phase II environmental site assessment. Reviewing and approving quotes in draft third party journal article on defects in green building contracts. Drafting form contract for LEED consultant to use in responding to RFPs. Lunch with prospective client]. 04:00 p.m.

Green 149
article thumbnail

Does a BIM Requirement Stop You From Bidding?

Carol Hagen

You may want to ask your network connections, as many business who started in drafting and design have made substantial investments to offer BIM services to specialty contractors. Just last week the Phoenix Revit Users Group had Jim Balding, founder and CEO of the Ant Group speak about where the new technologies are heading.

BIM 185
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Real Property Owners with JOC Experience Needed! – National Job Order Contracting Study

Building Information Management

The following are major activities that will be performed along with estimated completion dates and time frames: 1. JOC Conference held in Phoenix – January 2015: Completed. 4. Analysis of Data and Draft JOC Report – 11/20/2015. 2. Finalization of JOC Research Strategic Plan – March 2015: Completed.

article thumbnail

JOC Study Announced – Value of Job Order Contracting and Integrated Project Delivery

Building Information Management

The following are major activities that will be performed along with estimated completion dates and time frames: JOC Conference (to be held in Phoenix) (Organizations will also be given the option of participating by WebEx) 1/9/2015. Analysis of Data and Draft JOC Report 11/20/20015. Final JOC Report 1/25/2016.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

ft) flame under controlled conditions of draft and temperature onto the surface of a 7.4-m million-sf) panelized roof system using interior FRT lumber and plywood in Phoenix, Arizona. Fire performance is evaluated using UL 723, Standard for Test for Surface Burning Characteristics of Building Materials. The test consists of a 7.6-m

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport.

Income 108