Remove Certification Remove Electrical Remove Foundation Remove Leases
article thumbnail

M&V, MBCx, WTF: Building Performance Monitoring as a Means to Achieve Decarbonization Goals

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets. In short, utility meters provide the offset between consumption and production.

article thumbnail

AEE WEST 2023: Building Performance Monitoring

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets. In short, utility meters provide the offset between consumption and production.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Fall Conference Circuit: 12 Top Takeaways

Stok

2: Net Zero Electricity does not equal Net Zero Energy. While we’re pouring immense effort into cleaning up the electricity grid and seeing impressive progress, there are other types of fuel that we need to be tackling with the same tenacity if we’re to truly achieve aggressive Net Zero Energy targets. 9: Rebuilding with intangibles.

article thumbnail

How To Reduce Risk On Construction Projects

ProcurementExpress.com

Too many contractors design data centers where the level of the electrical systems are extreme 2N while leaving reliability gaps in the mechanical infrastructure. They do not understand enough to realize that cooling is as important as electrical power redundancy. The actual roof deck was a floor deck including the concrete slab. .

Risk 52
article thumbnail

COVER STORY: Shovel Ready Sites Are Growing From The Ground Up

Buisness Facilities Contributed Content

are implementing site certification programs called “shovel ready”—meaning that the site is primed and ready for economic development. Cloud’s Airport Industrial Park, an area certified as “Shovel Ready” under the Minnesota Department of Employment and Economic Development (DEED) Shovel Ready Site Certification Program.

Site 49
article thumbnail

How To Reduce Risk On Construction Projects

ProcurementExpress.com

Too many contractors design data centers where the level of the electrical systems are extreme 2N while leaving reliability gaps in the mechanical infrastructure. They do not understand enough to realize that cooling is as important as electrical power redundancy. The actual roof deck was a floor deck including the concrete slab. .

Risk 40
article thumbnail

FEATURE STORY: High-Tech Hubs Are Moving To Their Markets

Buisness Facilities Contributed Content

One of Pittsburgh’s top regional strengths is its Information and Communications (ICT) industry, which includes nearly 1,600 ICT firms with more than 26,000 employees and 6,000 computer and electrical engineers. Ceva will be the ninth company in the KBA facility, which is 80 percent leased. In the past decade, nearly $1.8