Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

LEAN JOC – Job Order Contracting

Job Order Contracting

The approach invests more resources earlier in the Project life-cycle. Work scope is developed and communicated is more detail and more effectively, resulting in the avoidance of traditionally prevalent delays, change orders, and associated skyrocketing costs. Asset Life-cycle Total-cost-of-ownership (TCO) Management www.4BT.us.

Contract 132
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

As a result, staggering levels of economic and environmental waster are common across the architectural, engineering, construction, operations, and owner groups. LEAN methods provide a proven integrated, coordinated, and efficient way to manage all project and program phases (from design through construction, into operation, and beyond).

article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

Mike White , Director of Design and Construction at North Point Hospitality (NPH) , is one individual who possesses these traits and abilities. I initially started at North Point, managing projects, then moved to Senior Project Manager and ultimately the Director of Design and Construction. I'll start at the beginning—my family.

Design 80
article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

As a result of 1800+ tests, researchers have concluded that a primary cause in low project performance (time, cost and customer satisfaction) is the traditional owner-vendor relationship in which the owner uses a design, bid and build (DBB) approach. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

Top 10 ERP Solutions for Construction Firms

Construction Marketing

Acumatica Construction Edition keeps your team on the same page, relying on a core system that has the latest project reports, contracts, budgets, plans, specifications, change orders, invoices, purchase orders and job costs. Reflex ERP. Penta Construction ERP was made for multi-location, labor intensive service contractors.